Missile Carrier Trailers

 

Description.  It consists of a semi trailer with specially designed suspension system to avoid shock and jerks, towed by a truck/ tractor. It is used for safe and secure transportation of missile from depot to fleet and back.

Specifications

  • Prime mover                                  -           Truck/ Tractor Nissan Diesel (4 x 2) Model PKC-                                                                                 311 BT

                                                                        (RHD)/any compatible tractor            

  • Length                                           -           36 ft
  • Width                                             -           8 ft
  • Payload                                         -           10 Ton
  • Chassis frame                               -           2 heavy duty beams with structural cross members
  • Suspension                                   -           Heavy duty leaf springs with shock absorbers
  • Jacks                                             -           Two mechanical adjustable traveling jacks provided                                                                at front end
  • Group                                            -           B-Group
  • Project Officer                               -           Lt Col Ghulam Shabbir Niazi

Details

  • Name of proj (as per contract)      -           Indigenous Dev of Missile Carrier (Type NM)
  • Contract No                                   -           27/213/2000/MV-8A/7-95/DP-9/2003
  • Prototype / Series                         -           Prototype
  • Firm                                               -           M/s  Colabrative Lhr
  • Date of contract                             -           28 Jun 03
  • Date of completion                        -           Jan 05
  • Cost per unit                                  -           Rs. 2.598 Mn
  • Total Qty / Total cost                     -           1
  • Sponsor                                        -            Dte NAI NHQ
  • Saving                                          -            12.99 Mn
  • Time taking to dev of proj.            -          1 year 7 months