Light Recovery Vehicle

 

Description.   Special vehicle designed to carry out recovery operations during peace and war such as lifting, pulling and towing of equipment causality. It is developed on truck 5 ton (4x4) Hino. It also helps to keep the route clear for troops and transportation on movements.

Specifications

  • Front winch
  • Pulling capacity                                   -           5 Ton
  • Winch winding speed                          -           7.8 m/ minute
  • Winch rope length                               -           60 m
  • Winch rope dia                                   -           12 m
  • Rear winch
    • Pulling capacity                                   -           6 Ton
    • Winch winding speed                          -           11.5 m/ minute
    • Winch rope length                               -           60 m
    • Winch rope dia                                    -           12 m
  • Boom
    • Boom rotation                                      -           270°
    • Fully retracted                                     -           6 Ton
    • Fully extended                                     -           3 Ton
    • Boom length (retracted)                      -           3.5 m  
    • Boom length (extended)                      -           5.5 m  
    • Boom rope dia                                     -           16 mm
    • Boom elevation (with 3 ton load)         -           45°
  • Group                                                        -           A-Group
  • Project Officer                                           -           Lt Col Syed Kashif Abbas Naqvi

Details

  • Name of Proj (as per contract)                  -           Fabrication of Light Recovery Equipment on Tank

Chassis 5 Ton 4x4.

  • Contract No.                                              -           27/479/LRV-I/MV-8A/7-109/DP-9/2002
  • Prototype / Series                                     -           Series
  • Firm                                                           -           M/s Javaid Industrial Company
  • Date of Contract                                        -           30 Jun 14
  • Date of completion                                    -           Jun 2019        
  • Sponsor                                                     -           EME Dte, GHQ
  • Cost per unit                                              -           Rs. 8.125 Mn
  • Total Qty / Total cost                                 -           04/ Rs 32.50 Mn
  • Saving                                                       -           Rs 130.0 Mn
  • Time taken to dev of proj                          -           On going Project