Light Weight Portable Bridge (Prototype)

 

 

 

Description.   Light Weight Portable Bridge is used for keeping communication and infrastructure open. It is used in hilly areas, especially in glaciers. It is used in hilly areas for crossing crevices, nullah, and ditches upto 20 feet spans. It is modular in design by special aluminum alloy bridge. This bridge can sustain load of 400 kg with 100% safety margin. Six soldiers can pass through it at one time. The bridge can easily assembled in 30 minutes and can also be stripped off in 20 minutes.

Specifications

 

  • Overall length                                -           30 ft
  • Width of bridge                              -           2 ft 6 inches
  • Height of bridge                             -           2 ft 5 inches
  • Load carrying capacity                  -           400 kg
  • Number of section/ modules         -           5
  • Length of each section                  -           6 ft
  • Weight of each section                  -           < 15 kg
  • Bank seating (on either side)        -           4 to 5 ft
  • Operating temperature                  -           -400 C to +600 C
  • Deflection (under max load)          -           < 3 inches
  • Group                                            -           A-Group
  • Project Officer                               -           Lt Col Kamal Khan

                                                                 

Details Details

  • Name of Proj (as per contract)      -           Light Weight Portable Bridge (LWPB)
  • Contract No.                                  -           27/394/LWPB/2006/MV-8A
  • Prototype / Series                         -           Prototype
  • Firm                                               -           Ms/ Sawana Islamabad
  • Date of Contract                            -           26 Jun 06
  • Date of completion                        -           Feb 07
  • Sponsor                                         -           Inf Dte, GHQ
  • Cost per unit                                  -           Rs. 0.245 Mn
  • Total Qty / Total cost                     -           01
  • Saving                                           -           0.255 Mn
  • Time taken to dev of proj              -           8 Months